Motorway, Corridor Vc: Section Počitelj -Zvirovići
In 2018 IPSA INSTITUTE signed the contract for the supervision of works on the highway on corridor Vc, subsection Počitelj – Zvirovići which services we still provide. The investment value of the project is €85 mil.
Project characteristics:
The Počitelj – Zvirovići subsection is 11.75 km long, and the most significant structure on the subsection is the Počitelj Bridge with a total length of 945 meters and a maximum height of 100 meters, the construction of which will connect the two banks of the Neretva River. In addition to the bridge, an interchange will also be built together with a toll road station and access roads to the Buna – Domanovići regional road and the M-17 main road, three viaducts, a tunnel and an open route. Sub-section is divided to two LOTs;
- Lot 1 (the Počitelj interchange – the beginning of the Počitelj bridge and the end of the Počitelj bridge – the Zvirovići interchange)
- Lot 2: Bridge Počitelj (from km 3+425,00 to km 4+404,00) in total length of 0,98 km.
Project is financed from the loan agreement signed with European Investment Bank (EIB)