PRELIMINARY REHABILITATION AND EXTENSION DESIGN OF THE TREBINJE WASTE WATER TREATMENT PLANT 50.000 PE

Project details

Development of the final rehabilitation and extension design of the Trebinje waste water treatment plant. The preliminary design for phase I of the rehabilitation and extension of the Trebinje WWTP was developed in line with the feasibility study. The design is comprised of the technological, hydraulic engineering and electrical engineering portions. The existing plant has a total capacity of 50.000 PE, 30.000 PE generated by the population and 20.000 PE generated by the industry. The envisaged rehabilitation works comprise:

  • Replacement of the existing coarse and fine screens
  • Replacement of the drives of primary and secondary traps
  • Overhaul and installation of new drives for the raw water and primary sludge pumping stations
  • Overhaul of surface aerators
  • Rehabilitation of the sludge digestion plant – replacement of pumps, heat exchangers and the cogeneration plant

Envisaged construction works on new structures:

  • Anaerobic pool
  • Gravity belt sludge thickener
  • Digested sludge storage pool
  • Dewater sludge cake storage

New pipelines measuring 520m’ in total are envisaged as part of the rehabilitation and extension works.

All HYDRO projects Download here 

Client

THE CITY OF TREBINJE