logo

PRELIMINARY AND FINAL DESIGNS OF THE SEWERAGE SYSTEM AND FOUL WASTE WATER TREATMENT SYSTEM – BOSANSKI PETROVAC

Project details

Preliminary and final designs of the sewerage network with a design channel length of approx. 35.0 km, 300mm to 500mm profiles and a 10 000 ES central waste water treatment device. The Environmental Impact Assessment for the Sewerage System forms a part of the documents

All HYDRO projects Download here 

Client

BOSANSKI PETROVAC MUNICIPALITY
  • Share