logo

MODIFICATIONS AND SUPPLEMENTS TO THE FINAL DESIGN OF THE UBORAK SOLID WASTE LANDFILL – MOSTAR

Project details

The final design of the municipal waste disposal site, suitable for a population of 60,000 and commissioned by the City of Mostar, was developed. The existing design documents were finalised and aligned with local and international technical and legal requirements for municipal solid waste disposal sites. The following technical solutions were developed as part of the final design:

• Enabling works concerning landscaping and the regulation of the Sušice river channel,
• Entrance/exit zone (administration building, weigh-bridge, washing facility for the bottom surface of lorries, petrol station, equipment and vehicle maintenance workshop),
• Recycling facility,
• Landfill body,
• Road infrastructure at the access to and within the landfill compound,
• External lighting and power supply,
• Drinking water supply, hydrant network, water reservoir,
• Rain and foul water sewerage,
• Treatment of leachate from the landfill body and the recycling facility.

All HYDRO projects Download here 

Client

JKP Deponija Mostar (Public Cantonal Company Deponija Mostar)
  • Share