FINAL DESIGN OF THE WATER SUPPLY SYSTEM FOR THE gubavica – pijesci AREA

Project details

Development of the Final Water Supply Design for the Gubavica – Pijesci area, Mostar, as well as the final desing for two reservoirs with a capacity of V=2×75 m3 and V=2×200 m3 respectively. The total length of the water supply network measures around 25 km.

All HYDRO projects Download here 

Client

THE CITY OF MOSTAR