Corridor vc motorway, section: POČITELJ – ZVIROVIĆI, LOT 1

Project details

External and internal surface water drainage systems, including treatment solutions and treated water layouts, were designed for an approx. 7km long motorway stretch. The channels are approx. 16.0 km long in total. The design channel diameters measure from 160 mm to 600 mm. The internal drainage system includes all 4 bridges and tunnel drainage. It is worth mentioning that an internal drainage system design was developed for the 975m long Počitelj bridge as well as for the 1100m long Počitelj twin-tube tunnel.

Design of water supply and sewerage installations for 2 toll stations

The share of hydraulic engineering design work in the overall value of IPSA’s Contract is 10%.

All HYDRO projects Download here 

Client

JP AUTOCESTE FBiH (PUBLIC COMPANY MOTORWAYS OF FBIH)